Pipeline (3)
Kinder Morgan 30m Pipe Line Buffer (4)
Hydro Line (6)
| Hydro Primary |
| Hydro Secondary |
| Hydro Transmission |
| Hydro Duct Bank |
Hydro Facility (7)
| Switch Kiosk |
| Transformer |
Cable Facility (9)
Cable Line (10)
| Cable |
| Conduit |
Gas Annotation (12)
Gas Facility (13)
| Distribution Station |
| Distribution Valve |
| Transmission Station |
| Transmission Valve |
Gas Line (14)
| Intermediate |
| Transmission |
| Distribution |
Gas Line - Dead (15)
Tel Fiber (17)
Tel Line (18)
| Conduit |
| Direct Buried |
Tel Facility (19)
| Base |
| Manhole |
| Pedestal |
| Pole |
City Building (20)
City Roadway (21)
City Property (22)
Fire Location (24)
Fire Boundary (25)
Trigger Point 1 (26)
Trigger Point 2 (27)
Road Detour (29)
Sandbag Location (30)
Road Closed (31)
Resiliency Centre (32)
EOC (33)
Trail Closed (34)
No Pedestrian Access (35)
Closed Boat Launch (36)
Detour Route (37)
EOC Evacuation Area (38)
| Alert |
| Order |
| Rescind |
| Local Emergency |
20yr Floodplain (39)
200yr Floodplain (40)
EOC Evacuation Area (42)
| ALERT |
| ORDER |
| RESCIND |
| LOCAL EMERGENCY |
Flood Property Yr 20Yr (43)
| Protected by Berm |
| Not Protected by Berm |
Emergency Berm (44)
Dike Riverbank (45)
Flood City Impact (46)
| Protected by Berm |
| Not Protected by Berm |
Sprinkler Protection (47)
EOC Fire Area (48)
Highway Entrance Points (49)
Potential Trigger (50)
Primary Evacuation Route (51)
Secondary Road Connection (52)
EOC Polygon (53)
EOC Line (54)
|